 |
Environmental
Compliance Support to NASA/Ames Research Center (ARC),
Moffett Field, CA |
|
| PAI
ensures that ARC is in compliance with environmental
regulations and environmental permit requirements. This
support includes monitoring air and water quality;
reviewing hazardous material storage; obtaining industrial
wastewater and storm water discharge permits; and
preparing Spill Prevention, Control, and Countermeasure (SPCC)
plans. PAI develops and implements numerous environmental
plans, policies, procedures, guidelines, and handbooks. In
the event of a chemical spill or release, we also conduct
air, water, and soil sampling to assess the environmental
impact.
BACK TO MENU |
|
 |
CWA/NPDES
and CERCLA Support at the Weldon Spring Site (WSS) |
|
| PAI
provides oversight for the CWA/NPDES Program at WSS. This
includes preparing applications for general, stormwater,
and construction permits; ensuring compliance with permit
requirements; and managing and monitoring the WSS wetlands
mitigation project. PAI also prepares (or reviews) and
coordinates approval of WSS CERCLA documents and leads
meetings with the regulators and the public. BACK TO MENU |
|
|
|
| PAI
planned, supervised, and conducted periodic RCRA
compliance inspections of waste generation and
accumulation activities at NTS. These activities included
hazardous waste determinations, regulatory analyses,
compliance evaluation inspections, deficiency reports, and
corrective action recommendations.
BACK TO MENU |
|
 |
Air
Permit Program at Fort Campbell, Kentucky |
|
| PAI
has prepared air permit applications, performed air
emission analyses, and conducted compliance audits for
multiple stationary emission sources. BACK TO MENU |
|
 |
Comprehensive
Environmental Compliance Assessments for Defense Threat
Reduction Agency Radiation Simulators |
|
| PAI
assessed oil spill prevention control, hazardous and solid
waste management, air and water quality management,
environmental restoration, occupational safety and hazard
communication, and environmental program management.
BACK TO MENU |
|
 |
Development
of Pollution Prevention (P2) Program at the East Tennessee
Technology Park (ETTP) |
|
| PAI
has been instrumental in developing the ETTP P2 program.
To implement the program, PAI designed a comprehensive
three-phase model that is emulated at other federal
government installations. BACK TO MENU |
|
 |
Environmental
Program Management for the NASA/Ames Research Center (ARC) |
|
| PAI
coordinates all environmental compliance
activities/programs at ARC, including hazardous waste
management; P2; spill control and response; and compliance
with NEPA, CERCLA, CAA, CWA, Endangered Species Act, and
other federal and state laws. PAI also provides training,
performs sampling and analysis, and oversees site
restoration activities. BACK TO MENU |
|
 |
Environmental
Compliance Assurance for Wackenhut Services, Inc. (WSI) at
the Oak Ridge Reservation (ORR) |
|
| For
WSI, which provides ORR-wide safeguards and security
services, PAI ensures environmental compliance, including
establishing WSI’s Pollution Prevention (P2) Program,
managing hazardous waste, and monitoring air emissions.
BACK TO MENU |
|
 |
Compliance Assessment for RCRA Part B Permits, ETTP |
|
| PAI
reviewed all applicable RCRA Part B permits and in-house
procedures for hazardous waste container and tank storage
at ETTP. PAI identified and determined the compliance
status of over 600 requirements units and, where
necessary, recommended corrective actions.
BACK TO MENU |
|
 |
Sitewide
Asbestos Survey at the Y-12 Plant |
|
| PAI
helped Y-12 comply with the Asbestos Hazard Emergency
Response Act (AHERA) by conducting an extensive asbestos
survey of 36 process buildings at the Y-12 Plant. PAI
collected more than 800 samples, evaluated the condition
of asbestos-containing materials, and recommended
corrective and maintenance activities. BACK TO MENU |
|