Operational
Assessments of Manufacturing Facilities at SRS |
|
|
PAI assisted in conducting startup readiness
reviews of H-234 tritium inventory increase, H-232
Extraction Facility, H-232 Hydride Transport Vessel
Unloading Station, Container Management Facility, and
Function Test Facility. BACK TO MENU
|
|
 |
CM
Upgrade Support to ORNL |
|
|
PAI personnel reviewed drawings and design
specifications at REDC and identified discrepancies with
the then-current physical configuration. PAI personnel
also assisted in preparation of configuration management
drawings, including facility as-built, electrical, fire
protection system, secondary containment, ventilation
systems, and utilities drawings. BACK TO MENU
|
|
 |
Review
of Systems Engineering Approach at the DOE Hanford Site |
|
|
PAI reviewed the management and operating
contractor's sitewide and programmatic systems engineering
approach. This quick-turnaround effort included an
analysis of systems engineering and configuration
management plans and techniques. BACK TO MENU
|
|
 |
Restart
Activities at the Y-12 Plant |
|
|
PAI
assisted in the technical review of the design and
operation of the Y-12 restart effort. PAI also assisted in
the development of a new guidance manual for radiological
facility restart. BACK TO MENU
|
|
 |
Procedures
Update for the Radiochemical Engineering Development Center
(REDC) at the Oak Ridge National Laboratory (ORNL) |
|
|
PAI reviewed existing operating procedures for
safety, completeness, and continuity, and updated the
procedures. PAI then inter-viewed REDC personnel to
identify undocumented procedures, which were later
prepared in accordance with the standard format. Within 4
months, a total of 166 procedures were updated or
prepared. BACK
TO MENU
|
|
 |
Configuration
Management (CM) Program at the DOE Savannah River Site (SRS) |
|
|
PAI reviewed the Separations CM program,
including a comparison with the Reactor CM program, DOE
Orders, and the Institute of Nuclear Power Operations Good
Practices Standard. Following the review, PAI developed a
CM guidance document and performed an in-depth evaluation
of the program. BACK TO MENU
|
|
 |
Conduct
of Operations and Operational Safety Reviews for the Energy
Technology Engineering Center (ETEC) |
|
|
PAI assessed the conduct of operations at the
ETEC against the elements of DOE Order 5480.19 by
reviewing facility procedures, interviewing facility
personnel, and conducting facility walkthroughs.
Recommendations were made in each functional area. PAI
also assisted the Environment, Safety and Facility
Operations Division by performing walkdowns and
inspections of Lawrence Livermore National Laboratory
(LLNL) buildings, reviewing LLNL operational safety
procedures, and appraising site construction safety. BACK TO MENU
|
|
 |
Property
Management for the Weldon Spring Site Remedial Action
Project (WSSRAP) |
|
|
PAI provides property management services
associated with the environmental restoration of the DOE
Comprehensive Environmental Response, Compensation, and
Liability Act site at Weldon Spring, Missouri. PAI
oversees DOE equipment and property utilized by the
project management contractor as well as DOE personnel.
PAI ensures proper property accountability for WSSRAP to
assure cost-effective management of government property
and equipment. BACK TO MENU
|
|