General:
PAI Corporation
(PAI) provides a broad spectrum of remediation/ construction services
under both the Comprehensive Environmental Response, Compensation, and
Liability Act (CERCLA) and the Resource Conservation and Recovery Act (RCRA).
Our clients include government agencies and commercial firms that have
recognized PAI's outstanding performance and support.
Specific Areas of Expertise:
 |
Project Management |
 |
Cost and Schedule
Control |
 |
Independent Cost
Estimates |
 |
Construction Oversight |
 |
Quality
Assurance/Quality Control |
 |
Health and Safety |
 |
Radiological Control |
Examples:
 |
Remediation/Construction
Oversight of the Quarry Water Treatment Plant at the DOE
Weldon Spring Site (WSS) |
|
|
This plant was designed and constructed, and is
operated to manage contaminated waters impounded at the
Weldon Spring Quarry. A physicochemical treatment process
is used to remove radionuclides, nitro-aromatics, and
metals from surface water contained in the quarry. PAI
oversaw design, construction, startup, and operations of
this plant for DOE. BACK TO MENU
|
|
 |
Remediation Engineering
Support Services to U.S. Department of Energy (DOE), Oak
Ridge Operations Office |
|
|
PAI has provided extensive remediation
engineering services to DOE at numerous sites throughout
Tennessee. PAI has performed remedial investigations and
feasibility studies; prepared remedial design work plans,
engineering evaluations/cost analyses, and action
memoranda; provided site radiation protection, safety and
health, and geologic services; supervised data quality
validation; and coordinated laboratory analysis. BACK TO MENU
|
|
 |
Remediation/Construction
Oversight of the Site Water Treatment Plant Facilities for
DOE/WSS |
|
|
The plant consists of a 1.5-acre double-lined
equalization basin with a capacity of 2 million
gallons and four 1-acre, single-lined effluent ponds with
a capacity of 1.3 million gallons each. The
equalization basin stores contaminated water awaiting
treatment, while the effluent ponds store treated water
prior to its release to the Missouri River. PAI provided
facility construction management oversight for DOE. BACK TO MENU
|
|
 |
Large Quonset Hut
Remediation Project at Benton Harbor, Michigan |
|
|
PAI provided site health physics services for
decontaminating the quonset hut concrete floor and walls,
and enclosed equipment. PAI was responsible for worker
radiation protection safety involving the
inhalation/ingestion of alpha radiation particles during
site remediation activities, such as scabbling,
shotblasting, vacuuming, and wiping the warehouse slab and
walls. Our personnel performed frisking, air sampling and
monitoring, regulatory interface, and site radcon
oversight. BACK TO MENU
|
|
 |
Independent Cost Estimates
for Defense Waste Processing Facility (DWPF) at DOE Savannah
River Site |
|
|
The DWPF was the largest glass vitrification
facility under construction in the country and consisted
of several separate projects, including (1) Auxiliary
Pump Pit (APP) Building, (2) APP Bypass,
(3) Ammonia Scrubber, and (4) Glass Storage
Building. Senior PAI cost engineers performed cost
analyses, material takeoffs, discrepancy resolution, labor
efficiency/factor evaluation, markup evaluation, and final
report preparation for these four projects. BACK TO MENU
|
|
 |
Woodlawn Landfill Extraction
and Monitoring Wells at Fort Campbell, Kentucky |
|
|
The U.S. Army Corps of
Engineers needed confirmatory data on the landfill’s
RCRA permit. PAI supervised the drilling and installation
of 2-in. and 4-in. extraction and monitoring wells. This
included constructing the decontamination pad, monitoring
the well drilling and grout pouring, decontaminating
equipment, and disposing of the waste. BACK TO MENU
|
|

|